District 5

NewNew Ft Pierce WestwoodFt Pierce Westwood High School 1801 Panther Ln Ft Pierce, Florida 34947 251,270 sq. ft. with 2000 student stations to include new Administration building, 61 classroom spaces, 20 labs, state-of-the art 750 seat Auditorium and Theater, 1332 seat Gymnasium, new sports fields, and an 858 seat Cafeteria. CTE programs to include: Agricultural,…

District 4

Upcoming Projects Carpet Replacement Replacing existing carpet and base with new VCT, LVT or carpet. St Lucie West Centennial Cost:  $1,700,000 Funded by: ESSER FundsPort St. Lucie High School Media CenterFlooringGroundsLandscapingHVAC Chiller Ice Plant HVAC Condenser Piping Replacement All LocationsWater Bottle Fill StationsAddition of 208 new water bottle fillers throughout the entire district. Cost: $312,000…

District 3

Upcoming Projects Re-Roofing St. Lucie West Centennial High School – $6,700,000 and St. Lucie West K-8 – $2,800,000 Funded by: CapitalUpcoming Projects HVAC HVAC Retrofit – Manatee Replacement of Existing Chilled Water Lines, Air Handler Units, Misc HVAC Equipment, Ductwork, lighting fixtures and acoustical ceiling and grids. Other work includes AHU room remodels including framing,…

District 2

Upcoming Projects HVAC HVAC – Mariposa Replacement of Existing Chilled Water Lines, Air Handler Units, Misc HVAC Equipment, Ductwork, lighting fixtures and acoustical ceiling and grids. Other work includes AHU room remodels including framing, drywall, paint and finish repairs. 2620 SE Mariposa Ave Port St Lucie, FL 34952 Cost:  $6,341,528 Funded by: ESSER FundsMariposa ElementaryOutdoor…

District 1

NewTradition DDDThe new Tradition DDD High School: 251,270 sq. ft., 2000 student stations, Administration building, 61 classroom spaces, 20 labs, state-of-the art 750 seat Auditorium and Theater, 1332 seat Gymnasium, new sports fields and an 858 seat Cafeteria. CTE programs to include: Biomedical, Nursing, Dental, Physical Therapy, Hospital, Logistics, Digital Design Video/Cinema Production, Theater, Music,…